The client was increasing the capacity of the cool room in their packing shed and required an upgrade of their existing overhead service line to a new 4 core 240mm underground mains cable. A new cable requiring an under road bore was installed to a pillar and then an underground service cable was installed to their metering position. The necessary metering upgrade was also arranged and installed as part of the project.