Gerraffa, Bertram Rd Euston – Supply Upgrade

The client was building a new house and upgrading the cool room in their packing shed which required the existing supply to be upgraded. We were engaged to install a new 315Kva Substation pole, retire 2 bays of low Voltage conductor and install 30m of 4 core 240mm LV mains cable to a new pillar. We also install a new service cable from the pillar to the customer metering cabinet and arranged for CT metering to be installed.