McDonalds Moama NSW Level 1

Spot On Power Projects was engaged by the client to install a 315kva Pad Mount transformer to supply a new McDonald restaurant on the Perricoota Rd at Moama, which had been temporarily supplied power by a generator.

The project included the installation of an underground high voltage cable to supply the transformer, the connection of the new transformer to a second existing underground circuit so as to maintain a loop in the Essential Energy network and the connection of the transformer to the customers switchboard.

Kyalite Pistachios, Supply Upgrade

Kyalite Pistachios, Supply Upgrade

The client was building a new house adjacent to an existing farm supply but needed the supply upgraded for the extra load. The existing single phase pole mounted substation was upgraded to 3 phase 63kKva and the existing underground service cable and metering were upgraded.

Scown, North Barham Rd Barham – New Supply

Scown, North Barham Rd Barham, New Supply

The client had recently purchased and rural property and needs to connect power to a shed on the property. We were engaged to build and new single phase 25Kva substation pole. Once built a 50mm underground service requiring an under road bore was installed to a pillar at the customers property. The necessary metering was also arranged and installed as part of the project.

Gerraffa, Bertram Rd Euston – Supply Upgrade

The client was building a new house and upgrading the cool room in their packing shed which required the existing supply to be upgraded. We were engaged to install a new 315Kva Substation pole, retire 2 bays of low Voltage conductor and install 30m of 4 core 240mm LV mains cable to a new pillar. We also install a new service cable from the pillar to the customer metering cabinet and arranged for CT metering to be installed.

Violi, Euston – Mains Upgrade

Violi, Euston – Mains Upgrade

The client was increasing the capacity of the cool room in their packing shed and required an upgrade of their existing overhead service line to a new 4 core 240mm underground mains cable. A new cable requiring an under road bore was installed to a pillar and then an underground service cable was installed to their metering position. The necessary metering upgrade was also arranged and installed as part of the project.

Golden Rivers Crematorium

Golden Rivers Crematorium

The client was building a crematorium and needed to connect supply. We were engaged to install a 3 phase 25mm underground service cable requiring an under road bore to a pit at the customers property.

Barham Golf Club Estate, 21 Lot Subdivision

The club was developing a new 21 lot residential subdivision adjacent their golf course. The project required a new bay of HV overhead conductor and 270m of 35mm HV underground cable. A new pole mounted 200kva substation. 370m of 4 core 240mm LV underground cable, 6 Pillars, 6 Pits and 4 street light columns.